A solid block of frozen soil was created a distance of 50 feet (West) to 100 feet (East) outside the shaft after freezing for about 6 weeks. The frozen soil successfully stabilized the soils outside each tunnel and allowed the contractor to mine into and out of the shaft and refurbish the TBM, with no water or soil intrusion into the shaft.
|